No.
|
Client
|
Description of Work
|
1
|
Saudi Electricity Company
|
- Construction of 132kV Double Circuit OHL from S/S 8068(Huraymala) to S/S 8502(HawatSudair)
- Including Change Order on 380 KV Line
|
2
|
Saudi Aramco
(MRK)
|
- Replacement of 13.8 KV Line in GOSP 7 & Construction of 115 KV Overhead Transmission Line for GOSP 1,4,5,7,8 – Saudi Aramco
|
3
|
Bisha Cement Plant
|
- Fabrication and Installation of vent duct for bag filter truss conveyor and structural steel fabrication and erection work.
- Fabrication and installation of structural steel for bucket convoyer
- Local fabrication and installation or preheat tower and raw mill
- Installation of blower, fan motors A/C, Water Chiller pumps, plant utility works.
- Hydro-Pneumatic Reservoirs and pipeline works
- Pipeline works for fire fighting, fuel, air, lubrication, water treatment plant and jacketing works.
- Installation of laboratory equipment & electric equipments, pumps sewage plant utility works
|
4
|
Saudi Electricity Company
|
- Construction of 132kV Double Circuit OHL from S/S 9009(PP9) to S/S 8505(Rumah)
|
5
|
S.S.E.M
|
- Installation of 10 MW Power plant a Khalibar
- Fabrication and Installation of OIL, Diesel and water pumps and associated pipe lines
- Fabrication and installation of overhead crane, Ventilation System with Intake air filter
- Construction of water Treatment facility and treated water tank (Elevated with structure)
- Electrical works (Cabling Switch gear, transformer and control panel)
- Installation of Exhaust Stack
|
6
|
Lucky Development Co. Ltd.
|
- Installation of Water chiller, Chilled Water Pipe Line
- Fabrication and installation of HVAC Duct works & Ventilation
- Installation of smoke and
- pressuraization Fans
|
7
|
SSEM
|
- Foundation and Tower Erection for 132 KV Double Circuit Overhead Line from Al-Wajh To Al- Ulla
|
8
|
Swayeh
|
- 13.8kV Distribution network for water conveyance project from Busayath well field to Qurayat city
|
9
|
SCECO PP5
|
- Rehabilitation of Air Intake Hood
- Fabrication and Installation of Lube Oil Condenser
- Major repair of Transition Duct
|
10
|
Olayan Saudi Holding Co.
|
- Renovation works for irrigation water line for lanscaping
- Fabrication and Installation of water tower, Pumps for Oil, Water and Diesel fuel
- Fabrication and Installation of Auxiliary Water tank and associated Civil work
|
11
|
E.A. Juffali & Brothers
|
- Installation of Water Chiller and Piping
- Duct works & Ventilation and related facilities
|
12
|
Arab investment Co.
|
- Installation of Electric meters
- Fabrication and Installation of Electric Main Panel
|
13
|
Muncipality of Hofuf
|
- Installation of Water Treatment Tank and Aeration Tank
- Rehabilitation of Sludge Pump (250 Hp) and major rehabilitation of Scraper facility
- Fabrication of water tower structure (30 meter hieght)
|
14
|
G.I.D. Training Center
|
- Installation of Generator sets and Overhead Crane
- Pipe Works for Fuel, oil, water radiator etc.
|
15
|
SCECO PP5
|
- Exhaust Diffuser and silencer
- Fabrication and Installation of Flycol cooler
- ABB Gas Turbine works and Pumps for Lube Oil, Air/Air cooler
|
16
|
SCECO PP3
|
- Installation of Starting Package for 60 MW Turbine
- Repair of Exhaust Stack Structure with sheet Metal Cladding (Internal and External)
- Repair of Transition Duct
|
17
|
Olayan Saudi Holding Co.
|
- Construction of Multi-purpose Hall with electric facilities, fire alarm, fire fighting & pipe works.
|
18
|
Gurayat Government Hospital
|
- Mechanical work for HVAC, Ducting and Installation of air Handling Units and Related Equipment
- Mechanical Work for HVAC
- Testing and Balancing
|
19
|
Saudi Aramco Riyadh Bulk Plant Catch Basin
|
- Installation of Riyadh Bulk Plant
- Pipe works and installation of works for Catch Basin
- Water treatment Rehabilitation Works
|
20
|
Saudi Aramco Sullayil
|
- Fabrication and Installation of Heat Exchanger
- Associated works for Heat Exchanger
- Fabrication and Installation of Air/air and Oil Cooler
|
21
|
Six Villas at Sulaimania, Riyadh
|
- Renovation, HVAC, Plumping and Electrical works and Civil works
|
22
|
Rafha Power Station
|
- Installation of 12 Mw Generator, Fuel, Oil and fire Fighting Pipe Works
- Installation of Water Treatment Plant
|
23
|
Saudi Aramco, Riyadh
|
-
- Fabrication and Installation of Structural Works
|
24
|
Electricity Coorporation, Turaif
|
- Renovation and Retrofit Works 13.8 KV switchgear and control panel
|
25
|
Electricity Coorporation
|
-
- Installation of 6 MW Generator and Switchboard
- Electrical Installation (Transfomer, Switch Gear control panel, etc.)
|
26
|
Electricity Coorporation, Mahad al Dahab
|
- Complete Installation and Operation of 3×3.5 MW Diesel Power Plant
- Mechanical Works at the Power Plant
|
27
|
Electricity Coorporation, Tabuk
|
- Installation of 33 KV, 630A Switchgear
- Testing and Commissioning of Switchgear
|
28
|
G.I.D Training Center
|
- Installation of 2 MW Transformer
- Testing & Commissioning of Transformer and Switchgear
|
29
|
Electricity Coorporation, Khakir
|
- Mechanical Installation & fabrication works for 3×1.75 MW diesel Power Plant installation
- Water Treatment Plant Rehabilitation
|
30
|
SCECO PP3
|
- Repair of Stack joint Seals
- Rehabilitation of Starting Package
|
31
|
Al Janoub Project
|
- Hydrogen Storage Bottle and Building Structure
- 5 x 1,360 KVA with Switchboard & fuel oil treatment
- Supply & Installation of Crude Oil Generator and Heavy Fuel Oil Treatment Plant
- Supply & Installation of Water Treatment facility
- Installation of Distribution Panel
|
32
|
SCECO PP4
|
- Repair and Installation of Exhaust Stack & Chimney
|
33
|
SCECO PP7
|
- Fabrication and Installation of Cooling Tower
|
34
|
SCECO PP4
|
- Fabrication and Installation of Overhead Crane 50 ton
|
35
|
SCECO PP2
|
- Installation of 3,000 cfm Air Compressor including Air Receiver Tank Drayer, Oil Cooler and Air Line
|
36
|
Ministry of Defence, King Lhaled Military City
|
- Supply and Installation of control System for chiller Water plant of KKMC
|
37
|
Electricity Coorporation, Mahad Al Dahab
|
- Fabrication and Installation of Lube Oil Cooler
- Rehabilitation of Lube Oil pipe line
- Installation of Oil Sludge Pump and Repair Works
|
38
|
E. A. Juffali & Brothers
|
- Rehabilitation and Installation of 250 HP Sewage Pumps
- Fabrication and Installation of Treated Water Tank Power
- Rehabilitation and Repair of Crawler Crane
|
39
|
SCECO PP4
|
- Installation and Overhauling of 1600 cfm Air Compressor
|
40
|
SCECO PP7
|
- Relocation of 4 MW Generator set (from Afif to Riyadh)
- Overhauling of Generator and Air Cooler
- Fabrication of cable tray Support Structure and Laying of Cable Trays and cables
|
41
|
SCECO PP5
|
- Repair and Installation of Exhaust Diffuser and Stack Structure and related works
|
42
|
Southeren Province Cement Co., Bisha
|
- Local fabrication and installation of Finish Mill
- Rehabilitation of Deduster and structural Expansion
|
43
|
Southern Province Cement Co. Jizan
|
- Installation of Swewage Tratment Plant
- Installation of Hydro-Pneumatic Tank
- Expansion of Automatic Air Pulsation Cleane
|
44
|
SCECO PP7
|
- Repair of Air Cleaner Package for Genset
|
45
|
SCECO PP3
|
- Structural Repair of Exhaust Stack and Deflectors
- Repair of Exhaust Transition
|
46
|
SCECO PP3 Phase 1 & 2
|
- Repair of Exhaust Stack and Transition
- Rehabilitation of Intake Duct and Manifol
|
47
|
Ministry of Defense – Arar/Hadisha
|
- Transfer of Diesel Genset from Arar to Hadisha construction of New Power Plant Building in Arar
- Re-installation of Transferred Genset including connections of diesel and fuel pipelines and the associated electrical works
|
48
|
SCECO PP4
|
- Overhauling and Repair of Overhead Crane
|
49
|
BPP2
|
- Cleaning and Repair of Lube Oil Water Heat Exchanger (12 nos.)
|
50
|
PP7
|
- Repair of Service Air Compressors (2 Units)
|
51
|
PP7
|
- Repair of Lube Oil Heat Exchanger
|
52
|
Ministry of finance
|
- Transfer of diesel Genset from Hail to Nasseriah Power Plant, Dismantling, Transfer, foundation, re-installation, Mechanical and Electrical connections
|
53
|
PP3 – Riyadh
|
- Cleaning/maintenance of Radiators
|
54
|
PP7
|
- Inspection of Main Atomizong Air Compressor
|
55
|
Yamamah Saudi Cement Company
|
- Package #3 – Fuel Gas In-Plant Piping
|
56
|
PP7
|
- Supply and Installation of New Air Circuit and Compressors
|
57
|
Qassim PP3
|
- Repair of Exhaust system of Gas Turbines
|
58
|
PP5-Riyadh
|
- Repair and Replacement of GT Insulation and Cladding for 5 Units
|
59
|
Qassim PP3
|
-
- Repair of Stack Joint Seals
|
60
|
MASS PROJETS
|
- Stringing of 132kV Double Circuit OHL from Madina North S/S to Khyber New S/S
|
61
|
Yamamha Saudi Cement Company
|
- Package #5m Line 7 Fuel Gas Turbines
|
62
|
AL-FANAR
|
- Emergency Shutdown Work of Tower Erection and Stringing of 380 KV Double Circuit Overhead Line towards S/S 9013
|
63
|
SWAYEH
|
- Installation of Double Circuit Overhead Distribution Line, Earthing & Lightening Protection – Najran Water Transmission Project
|
64
|
PP9
|
- Repair of GT #13 Damaged Parts
|
65
|
PP7
|
- Joint Repair Exhaust Plenum
- Unit# 13
|
66
|
Al-Fouzan National Guard and Military School campus
|
- Complete Supply and Installation of Electrical system
|
67
|
Al Fouzan (Minstry of Health)
|
- Riyadh Medical Complex
- Complete Supply and Installation of Electrical and Mechanical System
|
68
|
SEC – Qassim Power Plant
|
- Repair of hot Gas Exhaust for Unit #13 (Contract # 12002/49)
|
69
|
SEC-Layla Power Plant
|
- Repair of Exhaust Leckage for GT’s 3 & 4
|
70
|
PP – 9 Riyadh
|
|
71
|
PP – 9 Riyadh
|
- Convention of Crude oil firing system of natural Gas
|
72
|
PP-7 Riyadh
|
|
73
|
SEC-COA
|
- SECPP9-Repair Damaged Parts-GT#13
|
74
|
SEC-PP7
|
- Exhaust Plenum Repair of Gas Turbine frame 7001E for unit 11 in PP-7
|
75
|
Mawaris Co.
|
- Replacement of expansion joint of Unit # 01, 08 & 15 at PP-9
|
76
|
MOF
|
- Trouble shooting work at Nassaria PP
|
77
|
SECO-COA
|
- Fix or replace the insulation for (2) Chimney in Layla power plant.
|
78
|
SECO-COA
|
- Check and repair the Hot gas Exhaust for Unit #14 in Qassim Power Plant
|
79
|
SECO-COA
|
- Replacement of Air Cooler of ABB Unit # 8 & 9 at PP3-Riyadh
|
80
|
SCECO-COA
|
- Replacement of Air Cooled condenser shrouds at PP-9
|
81
|
Dallah Hospital
|
- Electrical Work (Cable Laying from Transformer Room to SCECO Room)
|
82
|
Al-Etack Est.
|
- Re-location of LPG & O2 tank in RMC
|
83
|
WETICO
|
- Sewage Water Treatment Plant Power Supply
|
84
|
SEC-COA
|
- Replacement of Buried Pipelines for PP-8
|
85
|
SCECO-SOA
|
- Replacement of existing compressed air system of GIS operating mechanism in 132KV substation
|
86
|
SEC-COA
|
- Replacement of Air Cooled Condenser Shrouds at PP-9
|
87
|
SEC-EOA
|
- Rehabilitation of Oil Pressure Alarm system for Azizia-Thuqba underground cables.
|
88
|
Dallah Hospital
|
- Electrical Work (Cable laying from Transformer room ro SCECO Room)
|
89
|
COMPACT
|
- Replacement of Lamellah Seal, Expansion Joint & Actuators at PP9
|
90
|
COMPACT
|
- Repair of Gt Plenum and replacement of Expansion Joint Liners at PP-9
|
91
|
SEC-EOA
|
- Repairing of Inlet Air Cooling Coils for 6 GE Units at QCCP
|
92
|
SEC-EOA
|
- Repairing of Inlet Air Cooling Coils for 6 GE Units at QCCP
|
93
|
SEC-PP 8
|
- Modification of Suldge & Diesel Oil System
|
94
|
SWAYEH
|
- 13.8 KV Double Circuit Over Head Line, Earthing , Lightining Protection &Installation.
|
95
|
QS PP3
|
- Fuel Boilers Repair Work At QCPP
|
96
|
SEC-COA
|
- Repair of Expansion Joint at PP-9
|
97
|
AL MARAI
|
- Rel . MV 13.8 KV Const’n Area B6A
|
98
|
Zamil
|
- Modification of Chiller Cooling System
|
99
|
SEC PP9
|
- Replacement of Air Cooled Condenser Shrouds of Section A1 and A2
|
100
|
SEC-SOA
Assir PP
|
- Re-Insulation and repair of exhaust plenum
- Supply & replacement of expansion joint
- Replacement of manhole gasket
|
101
|
SEC-SOA
Jazan PP
|
- Re-Insulation and repair of exhaust plenum
- Replacement of manhole gasket
|
102
|
SEC-SOA
Jazan pp
|
- Re-Insulation and repair of exhaust plenum
|
103
|
SEC-SOA
Jazan PP
|
- Re-Insulation and repair of exhaust plenum
- Re-insulation & repair of silencer sheet
- Replacement of manhole gasket
|
104
|
SEC-SOA
Najran PP
|
- Re-Insulation and repair of exhaust plenum
- Re-Insulation and repair of exhaust stack/chimney
- Replacement of manhole gasket
|
105
|
SEC-SOA
Najran PP
|
- Re-Insulation and repair of exhaust plenum
- Supply & replacement of expansion joint
|
106
|
SEC-SOA
Najran PP
|
- Supply and replacement of expansion joint
|
107
|
SEC-SOA
Bisha PP
|
- Supply and replacement of expansion joint
|
108
|
SWAYEH
|
- 13.8 OHL Earthing, Lighting Protection Installation
|
109
|
AL SHARQ
|
- Repair Work of Plenum and Transition Place Area of GT 13
|
110
|
AL SHARQ
|
- Repair of Silencer of GT # 13
|
111
|
AL SHARQ
|
- Repair of Transition Piece A Part
|
112
|
MOJ
|
- Improvement of A/C System in the Ministry New Building
|
113
|
SEC-COA
|
- Modification of Genertor Cooling System for ABB Generators at PP-4
|
114
|
SASO
|
- Mechanical & Fire Fighting Works
|
115
|
SEC-COA
|
- Repalcement of Air Cooled Condenser Shrouds of Section A1 & B2
|
116
|
ZAMIL
|
- Modification of Chiller Cooling System
|
117
|
KANOO
|
- Replacement of 2 Unit Expansion Joint at PP-9
|
118
|
AL MARAI
|
- Relocation of MV 13.8kV from Construction Area of B6A
|
119
|
SEC-COA
|
- Reparing of Plate Heat Exchanger ( Evaporator ) for Westinghouse 1-5 Cooling System
|
120
|
ALMARAI
|
- CPP2 Cold Store Expansion, B6A Capex., Supply & Install New Substation
|
121
|
ALMARAI
|
- Supply & Installation of 2 MVA Substation for Accommodation Phase6 at CPP
|
122
|
ALMARAI
|
- Supply & Installation of new CCP – EPT substation
|
123
|
ALMARAI
|
- Supply and Installation of Labels for the MV Equipments & MV Substation Identification, CPP1A
|
124
|
ALMARAI
|
- Supply & Installation of Labeling of LV Panel
|
125
|
ALMARAI
|
- Supply and Install Cables to various Panels in BSA, CPP2
|
126
|
ALMARAI
|
- Laying PVC Sleeves around B6A S/S
|
127
|
Najran GT#6
|
- Re-insulation, Repair and Replacement of Expansion Joint including Supply of Materials
|
128
|
Najran GT#6
|
- Replacement of Expansion Joint
|
129
|
Najran Gt#5
|
- Re-insulation and Repair of Expansion Joint including Supply of Materials
|
130
|
PP#9
|
|
131
|
PP#9
|
- Re-insulation and repair of silencer baffles
|
132
|
PP#9
|
- Repair of Exhaust system components
|
133
|
PP#7
|
- Complete inspection and repair of exhaust sytem of GT#11
|
134
|
Juba PP
|
|
135
|
Qassim PP
|
- Repair of expansion joint
|
136
|
Qassim PP
|
- Repair of Exhaust System W/H Unit # 1
|
137
|
Hail PP
|
- Inspect and repair parts of Chimney and repair Unit # 3
|
138
|
Hail PP
|
- Inspect and repair parts of Chimney and repair Unit # 2
|
139
|
PP#9
|
- Repair of Exhaust Plenum Expansion Joint GT # 6, 7, 8
|
140
|
PP # 9
|
- Replace Expansion Joint at GT # 6
- at Bypass exhaust stack expansion joint C
|
141
|
PP # 7
|
- Inspect and repair exhaust system of GT # 16
|
142
|
Juba PP
|
- Repair of exhaust system of Unit # 1
|
143
|
Juba PP
|
- Repair of exhaust system of Unit # 2
|
144
|
Juba PP
|
- Repair of exhaust system of Unit # 3
|
145
|
Juba PP
|
- Repair of exhaust system of Unit # 6
|
146
|
Asser PP
|
- Repair of Exhaust System Components for Asser Power Plant WH W501 D5
|
147
|
Najran PP
|
- Supply and replacement of expansion joint at unit no. 8 – GE-FR-7
|
148
|
Najran PP
|
- Repair Jobs on Unit Rate Basis at Najran Power Plant at Fait Unit No. 5 TG -20-B-7/8
|
149
|
Najran PP
|
- Supply and replacement of Expansion Joint & Re-insulation and repair of Exhaust Plenum including supply of materials
|
150
|
SEC-COA
|
- Replacement of Drinking Water
|
151
|
SEC-COA
|
- PP#5 Tank # 11 & Tank # 12 Diesel Fuel Interconnection
|
152
|
Ministry of Finance
|
- Relocation of HV Cables, 2 S/S and Lighting Pole between Hafr Al Bathain and Al Raghi
|
153
|
Almarai
|
- Supply & Install MV & LV Cables for Refrigeration Upgrade,, CPP
|
154
|
Almarai
|
- Repair of Piolt Cable CPP & Harad SCECO
|
155
|
Qassim PP
|
- Repair of Exhaust system GT#7
|
156
|
Qassim PP
|
- Painting Exhaust Chimney GT#7
|
157
|
Qassim PP
|
- Repair of Exhaust System GT#3
|
158
|
Qassim PP
|
- Repair of Expansion Joint GT#9
|
159
|
Qassim PP
|
- Repair of Expansion Joint GT#6
|
160
|
Hail PP
|
- Repair of Exhaust Chimney GT#5
|
161
|
Hail PP
|
- Repair of Exhaust Chimney GT#4
|
162
|
PP # 9
|
- Repair of Expansion Joint Unit#13
|
163
|
PP # 9
|
- Repair of Expansion Joint GT#7
|
164
|
Juba PP
|
- Repair of Exhaust System GT # 4
|
165
|
Asser PP
|
- Repair of Exhaust System Components GT # 2
|
166
|
Tihama PP
|
- Repair of Exhaust System Components GT#4
|
167
|
Tihama PP
|
- Repair of Exhaust System Components GT#13
|
168
|
Almarai
|
- Undergrounding of 33kv D.C OHL & PMT for Security Gate/Cradle Project
|
169
|
Almarai
|
- MV and LV Cabling For 2 MVA RO Substation Electrical Equipment
|
170
|
Najaran
|
- Repair, rehabilitation and replacement work on Exhaust Stacks GT # 2 Najran Power Plant
|
171
|
Almarai
|
- Service Maintenance Job for LoLo Farm
|
172
|
Ministry of Finance
|
- Relocation of HV Cables , 2 S/S and Lighting Pole Between Hafr al Bathain and Alraghi
|
173
|
SEC-COA
|
- Connect the Tank #12 with Spare Line of the Tank #11 at PP-5
|
174
|
SEC-COA
|
- Replacement of Drinking Water Pipeline at PP5
|
175
|
SEC-COA
|
- Gas Turbine Exhuast System Repair and Rehabilitaion at Central Power Plant -WESTINGHOUSE
|
176
|
Almarai
|
- Undergrounding of 33kv D.C OHL & PMT for Security Gate/Cradle Project
|
177
|
Almarai
|
- Repair of Pilot Cable CPP & Harad SEC
|
178
|
SEC-SOA
|
- Supply & Replacement of Expansion Joint of GT #8 at Najran PP
|
179
|
SEC-SOA
|
- Repair of Exhuast System of Unit #23 at Jazan PP
|
180
|
Almarai
|
- MV and LV Cabling For 2 MVA RO Substation Electrical Equipment
|
181
|
Almarai
|
- Replacement of 33KV Dist.Transformer
|
182
|
SEC-SOA
|
- Repair, rehabilitation and replacement work on Exhaust Stacks GT # 1 Aseer Power Plant
|
183
|
SEC-SOA
|
- Repair, rehabilitation and replacement work on Exhaust Stacks GT # 2 Najran Power Plant
|
184
|
WETICO
|
- Electrification Work at Jazan Immigration Housing
|
185
|
WETICO
|
- Electrification Work at ICDOC Dammam
|
186
|
Almarai
|
- Power Supply for New Building Accommodation Phase VII
|